A.The chief engineer
B.The second engineer
C.The third engineer
D.The fourth engineer
您可能感興趣的試卷
你可能感興趣的試題
A.Port state
B.The Administration
C.The shipowner
D.The master
A.to check and inspect foreign ships
B.to verify the condition of a ship in compliance with requirements of international conventions
C.to fine ships
D.to detain ships
A.failure of the proper operation of the main steering gear
B.failure of the proper operation of electrical installations
C.leakage of domestic water pump
D.insulation of exhaust pipes in engine room contaminated by oil
A.failure of the proper operation of emergency generator
B.insulation of piping including exhaust pipes in engine room contaminated by oil
C.improper operation of bilge of bilge of bilge pumping arrangements
D.damaged sanitary pump
A.excess amount of oily-water mixtures in bilges
B.insulation of piping including exhaust pipes in engine room contaminated by oil
C.improper operation of bilge pumping arrangements
D.paint peering off the uptake
最新試題
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
Using a file without a handle may result in ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
() is not installed on the main switchboar.
Under MARPOL Code the ship to which it applies has to carry ()
Which of the following items don’t belong to dock repair works?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.