單項(xiàng)選擇題Who will be responsible for ensuring that a ship maintains a standard at least equivalent to that specified in international conventions?()

A.Port state
B.The Administration
C.The shipowner
D.The master


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題The purpose of PSC is ()

A.to check and inspect foreign ships
B.to verify the condition of a ship in compliance with requirements of international conventions
C.to fine ships
D.to detain ships

2.單項(xiàng)選擇題During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()

A.failure of the proper operation of the main steering gear
B.failure of the proper operation of electrical installations
C.leakage of domestic water pump
D.insulation of exhaust pipes in engine room contaminated by oil

3.單項(xiàng)選擇題During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()

A.failure of the proper operation of emergency generator
B.insulation of piping including exhaust pipes in engine room contaminated by oil
C.improper operation of bilge of bilge of bilge pumping arrangements
D.damaged sanitary pump

4.單項(xiàng)選擇題During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()

A.excess amount of oily-water mixtures in bilges
B.insulation of piping including exhaust pipes in engine room contaminated by oil
C.improper operation of bilge pumping arrangements
D.paint peering off the uptake

5.單項(xiàng)選擇題During the PSC inspection under the provision of SOLAS 74, which one may be regarded as clear grounds for ships’ detainment?()

A.failure of proper operation of propulsion
B.paint peeling off the uptake
C.no operation procedures for the oil separators
D.damaged sanitary pump

最新試題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:單項(xiàng)選擇題

Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()

題型:單項(xiàng)選擇題

One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()

題型:單項(xiàng)選擇題

As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()

題型:單項(xiàng)選擇題

By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()

題型:單項(xiàng)選擇題

If two A.C.generators are to be operated in parallel, the load is distributed evenly by()

題型:單項(xiàng)選擇題

Engine parameters shall be corresponded to NOx Technical Files. This is required by ()

題型:單項(xiàng)選擇題

()connectors hold best if a wire is accidentally pulled or a connection becomes loose.

題型:單項(xiàng)選擇題

The cetane rating of diesel fuel is an indication of the ()

題型:單項(xiàng)選擇題

Diesel engine air start system check valves are opened by ()

題型:單項(xiàng)選擇題