When does auxiliary burner of incinerator put into operation? ()
Ⅰ. start incinerator when it is cold
Ⅱ. the sludge for dealing with is little
Ⅲ. the sludge for dealing with is large
Ⅳ. the water and impurity in sludge are too much
Ⅴ. the temperature in incinerator is low
Ⅵ. dealing with little solid rubbish
A.Ⅰ+Ⅱ+Ⅲ+Ⅴ
B.Ⅰ+Ⅱ+Ⅲ+Ⅳ
C.Ⅰ+Ⅳ+Ⅴ+Ⅵ
D.Ⅰ+Ⅱ+Ⅲ+Ⅵ
您可能感興趣的試卷
你可能感興趣的試題
A.working at intervals and properly heating
B.warming up to 70℃, increase water supply flow
C.improving impulse of water supply
D.reducing water supply flow
A.MARPOL Annex Ⅲ
B.MARPOL Annex Ⅵ
C.MARPOL Annex Ⅴ
D.MARPOL Annex Ⅳ
A.an International Ship Security Certificate
B.an International Oil Pollution Certificate
C.a Safety Management Certificate
D.an International Ballast Water Management Certificate
A.the master and the chief engineer are unable to communicate effectively
B.serious corrosion on the hull
C.damaged sanitary pump
D.one page missing in the oil record book
A.one year
B.two years
C.four years
D.five years
最新試題
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Cold weather starting of a diesel engine may be made easier by()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
The ISPS Code consists of a mandatory section-Part A, which shows()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()