單項選擇題Which one is NOT the ‘clear grounds’ for a more detailed inspection?()

A.the master and the chief engineer are unable to communicate effectively
B.serious corrosion on the hull
C.damaged sanitary pump
D.one page missing in the oil record book


您可能感興趣的試卷

你可能感興趣的試題

1.單項選擇題The shipboard oil pollution emergency plan will be invalid after ()

A.one year
B.two years
C.four years
D.five years

2.單項選擇題()connectors hold best if a wire is accidentally pulled or a connection becomes loose.

A.Ring type
B.Fork type
C.Spade type
D.Push on pull off type

3.單項選擇題()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.

A.anaerobic bacteria
B.aerobic bacteria
C.air bubbles
D.disinfection chemicals

4.單項選擇題For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()

A.the temperature and flow quantity of the exhaust gas from M.E
B.the quantity of steam demanded
C.the rotary speed and the cooling water temperature of main engine
D.efficiency of M.E turbocharger

5.單項選擇題A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()

A.purge lube oil from the liquid refrigerant
B.recover water purged from the system
C.separate foul gases from the receiver
D.purge non-condensable gases without losing refrigerant