A.failure of the proper operation of emergency generator
B.insulation of piping including exhaust pipes in engine room contaminated by oil
C.improper operation of bilge of bilge of bilge pumping arrangements
D.damaged sanitary pump
您可能感興趣的試卷
你可能感興趣的試題
A.excess amount of oily-water mixtures in bilges
B.insulation of piping including exhaust pipes in engine room contaminated by oil
C.improper operation of bilge pumping arrangements
D.paint peering off the uptake
A.failure of proper operation of propulsion
B.paint peeling off the uptake
C.no operation procedures for the oil separators
D.damaged sanitary pump
A.no operation procedures for the oil separators
B.engine log book missing
C.the master and the chief engineer are unable to communicate effectively
D.absence of an up-date muster list
A.the master and the chief engineer are unable to communicate effectively
B.serious corrosion on the hull
C.damaged sanitary pump
D.one page missing in the oil record book
A.absence of engine log book
B.serious corrosion on the hull
C.one page missing in the oil record book
D.paint peeling off some tailings in engine rooms
最新試題
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Which of the following items don’t belong to dock repair works?()
() is not installed on the main switchboar.
The ISPS Code consists of a mandatory section-Part A, which shows()
For a given exhaust gas boiler, what is the quantity of its evaporation mainly determined?()
Cold weather starting of a diesel engine may be made easier by()
The main purpose of port State control is not to()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Using a file without a handle may result in ()