A.making the repair list, booking spare parts and special tools for the dock repair
B.shutting off all of the S.W valves to outboard
C.the sketches or diagrams used for the dock repair
D.cleaning up the oil tank and boiler before enter the dock
您可能感興趣的試卷
你可能感興趣的試題
A.the highest
B.above 3/4
C.1/2 -3/4
D.the lowest
A.Ammeter and changeover switch
B.Power factor meter
C.Synchroscope
D.Reverse sequence relay
A.seal water supply be cut off
B.make up water supply be cut off
C.oil outlet valve closed or not open sufficiently
D.the flow rate of oily water is too much
When does auxiliary burner of incinerator put into operation? ()
Ⅰ. start incinerator when it is cold
Ⅱ. the sludge for dealing with is little
Ⅲ. the sludge for dealing with is large
Ⅳ. the water and impurity in sludge are too much
Ⅴ. the temperature in incinerator is low
Ⅵ. dealing with little solid rubbish
A.Ⅰ+Ⅱ+Ⅲ+Ⅴ
B.Ⅰ+Ⅱ+Ⅲ+Ⅳ
C.Ⅰ+Ⅳ+Ⅴ+Ⅵ
D.Ⅰ+Ⅱ+Ⅲ+Ⅵ
A.working at intervals and properly heating
B.warming up to 70℃, increase water supply flow
C.improving impulse of water supply
D.reducing water supply flow
最新試題
The shipboard oil pollution emergency plan will be invalid after ()
Using a file without a handle may result in ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
Which of the following items don’t belong to dock repair works?()
The main purpose of port State control is not to()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
If separating effect is not good, which measure should be taken ()