A.to free the carrying ship from liability
B.to free the non-carrying ship from liability
C.to free the ship in the wrong from liability
D.to free the ship not to blame from liability
您可能感興趣的試卷
你可能感興趣的試題
A.supplies or attempts to supply
B.imposes or attempts
C.complies or attempts to comply
D.provides or attempts to provide
A.packing,marking
B.pack,mark
C.packed,marked
D.be packed,be marked
A.to be seaworthy
B.being seaworthy
C.be seaworthy
D.seaworthy
A.though
B.thought
C.throw
D.through
A.pay
B.export
C.import
D.exercise
最新試題
An action for indemnity against a third person may()after the expiration of the year if brought within the time allowed by the law of the court seized of the case.
Where a charter-party states that a claim will be barred unless the claimant appoints an arbitrator within a specified period,the nominated arbitrator must be actually()within that period that has been appointed.
The merchant shall have the goods properly()and accurately and clearly()before shipment.
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
()the Charterer seeks to say that the contract has been frustrated or that there has been an anticipatory breach which entitles him to rescind,then he has such rights as are given him at common law.
If the state of the goods at the time they were handed over to the consignee has been the subject of a joint survey or inspection by the parties,notice in writing()be given of loss or damage ascertained during such survey or inspection.
The carrier has,before and at the beginning of the voyage,to()due diligence to make the ship seaworthy.
The carrier is entitled to limit his liability to the stated sum per package or unit even if he failedto exercise due diligence to make the vessel().
If a charter-party,although for two consecutive voyages,is held to be one indivisible contract,a deviation on the first voyage entitles the Charterer to treat the breach as a repudiation of()contract.
The merchant undertakes that no claim or allegation shall be made against any servant,agent or subcontractor of the carrier which()to impose upon any of them or any liability whatsoever in connection with the goods.