A.he
B.she
C.the owner
D.the shipper
您可能感興趣的試卷
你可能感興趣的試題
A.broken space
B.dead weight
C.constant
D.dead freight
A.a part of
B.the whole
C.3/4th of
D.1/2nd of
A.by the weight (tons) of cargo
B.by the capacity (tons) of vessel
C.by DW of the vessel
D.by the draft of the vessel
A.chartering
B.dispatching
C.fixing
D.tendering
A.on
B.to
C.at
D.in
最新試題
If the place named for the loading is simply a port or dock,notice of readiness may be given as soon as the ship arrives()although she is not in the particular spot where the loading is to take place.
If the Charterer nominates an unsafe port and the ship is damaged through going there,() will be liable for the damage,subject to that the master acts reasonably in going there.
()is not within the exception of the perils of the sea.
The carrier is entitled to limit his liability to the stated sum per package or unit even if he failedto exercise due diligence to make the vessel().
The object of the both-to-blame collision clause is().
()payment of the hire the Owners may withdraw the Vessel from the service of Charterers,without prejudice to any claim Owners may otherwise have on Charterers under this Charter.
The carrier has,before and at the beginning of the voyage,to()due diligence to make the ship seaworthy.
Where a charter-party states that a claim will be barred unless the claimant appoints an arbitrator within a specified period,the nominated arbitrator must be actually()within that period that has been appointed.
If a charter-party,although for two consecutive voyages,is held to be one indivisible contract,a deviation on the first voyage entitles the Charterer to treat the breach as a repudiation of()contract.
Where a charter-party stated that errors of navigation were excluded,it was held that these words referred to non-negligent errors,and()not wide enough to embrace negligent errors.