單項(xiàng)選擇題“Insufficiency of manning or insufficiency of certification of seafarers ” is an identification of a ()

A.substandard ship
B.standard ship
C.over-standard ship
D.reference ship


您可能感興趣的試卷

你可能感興趣的試題

1.單項(xiàng)選擇題A vessel has been equipped with an oil lubricated stern bearing and is undergoing a routine dry-dock.Which of the following inspection should be made when the tail-shaft has been drawn?()

A.The overall condition of the bearing surface should be examined
B.The shaft liner should be inspected for cracks and tested to insure a tight fit
C.The stern tube should be tested for cracks with dye penetrant
D.all of above

2.單項(xiàng)選擇題Inspection of a vessel’s propeller during dry-dock should include ()

A.noting the condition of the fairwater
B.inspection of the keyway
C.logging inspection results in the official deck log
D.all of above

3.單項(xiàng)選擇題When the tail-shaft is drawn from a vessel in dry-dock, which of the following inspections is required to be carried out?()

A.The propeller hub taper and shaft keyway should be inspected for cracks or corrosion
B.The stern bearing alignment with the stern frame should be checked
C.The interior of the stern tube should be inspected for leaks
D.The shaft liner should be removed and inspected

4.單項(xiàng)選擇題Which of the listed types of files is the best for producing a fine finish on metal?()

A.Mill
B.Float
C.Warding
D.Second cut

5.單項(xiàng)選擇題The tool used in precision work to smooth or enlarge a slightly undersized hole, is called()

A.round out
B.round file
C.reamer
D.hole driller

最新試題

The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()

題型:?jiǎn)雾?xiàng)選擇題

Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()

題型:?jiǎn)雾?xiàng)選擇題

Engine parameters shall be corresponded to NOx Technical Files. This is required by ()

題型:?jiǎn)雾?xiàng)選擇題

Which of the following items don’t belong to dock repair works?()

題型:?jiǎn)雾?xiàng)選擇題

During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.

題型:?jiǎn)雾?xiàng)選擇題

As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題

Under MARPOL Code the ship to which it applies has to carry ()

題型:?jiǎn)雾?xiàng)選擇題

The cetane rating of diesel fuel is an indication of the ()

題型:?jiǎn)雾?xiàng)選擇題

()connectors hold best if a wire is accidentally pulled or a connection becomes loose.

題型:?jiǎn)雾?xiàng)選擇題