A.substandard ship
B.standard ship
C.over-standard ship
D.reference ship
您可能感興趣的試卷
你可能感興趣的試題
A.The overall condition of the bearing surface should be examined
B.The shaft liner should be inspected for cracks and tested to insure a tight fit
C.The stern tube should be tested for cracks with dye penetrant
D.all of above
A.noting the condition of the fairwater
B.inspection of the keyway
C.logging inspection results in the official deck log
D.all of above
A.The propeller hub taper and shaft keyway should be inspected for cracks or corrosion
B.The stern bearing alignment with the stern frame should be checked
C.The interior of the stern tube should be inspected for leaks
D.The shaft liner should be removed and inspected
A.Mill
B.Float
C.Warding
D.Second cut
A.round out
B.round file
C.reamer
D.hole driller
最新試題
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Which of the following items don’t belong to dock repair works?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Under MARPOL Code the ship to which it applies has to carry ()
The cetane rating of diesel fuel is an indication of the ()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.