A.125 mm
B.183 mm
C.215 mm
D.It depends on outside pipe diameter
您可能感興趣的試卷
你可能感興趣的試題
A.canister-type gas mask
B.fresh-air breathing apparatus
C.self-contained breathing apparatus
D.combustible gas indicator
A.One man report the fire, and the other two men fight the fire
B.One man report the fire, one man fight the fire, and one man evacuate and secure the area
C.One man report the fire, one man fight the fire, and one man act as a safety observer
D.All three men fight the fire and report it immediately after it is extinguished
A.holding its slops onboard until they can be pumped into the city sewer system
B.circulating them through the lube oil purifier to remove water and debris
C.holding its slops onboard until they can be discharged to a shore side reception facility
D.pumping them into a settling tank for separation before pumping the oily water residue overboard
A.locate the fire
B.determine which type of fire is burning
C.sound the alarm
D.fight the fire
A.flame relief valve
B.flame stopper
C.safety valve
D.flame arrester
最新試題
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
The main purpose of port State control is not to()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Using a file without a handle may result in ()
The cetane rating of diesel fuel is an indication of the ()
The treatment of the fuel oils involves storage, heating, filtering and()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Flame failure in an automatically fired auxiliary boiler can from a/an ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()