A.film speed
B.penetrometer
C.exposure reading
D.time of exposure
您可能感興趣的試卷
你可能感興趣的試題
A.bow and stern lines
B.breast lines
C.halyards
D.warps
A.pin
B.stem
C.box
D.stand
A.Certificate of Inspection
B.Classification Certificate
C.Load Line Certificate
D.Seaworthy Certificate
A.it
B.this
C.that
D.what
A.approves
B.alleges
C.allows
D.permits
最新試題
Before welding in a tank that has carried petroleum products,the tank must be certified by ().
Please arrange()a surveyor to inspect the damaged bulkhead.
At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for two years. This inspection shall be held between the tenth and fourteenth months of the duration period of the certificate and shall be().
During fueling,all doors,hatches,and ports().
At()an occasional survey has been carried out.
Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.
Chafing gear().
The conclusion is()the said ship is fit to continue to sail.
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().
At the same time,it is()for you to signify your acknowledgement of the responsibility for the collision by signing the copies of this letter hereto attached and to return me two copies in due time.