A.Certificate of Inspection
B.Classification Certificate
C.Load Line Certificate
D.Seaworthy Certificate
您可能感興趣的試卷
你可能感興趣的試題
A.it
B.this
C.that
D.what
A.approves
B.alleges
C.allows
D.permits
A.foot
B.heel
C.step
D.sole
A.prevent the boom from being raised too high
B.prevent the boom from swinging
C.support the boom when not in use
D.prevent the boom from being lowered
A.the three month period immediately following the certificate's anniversary date
B.the three month period immediately preceding the certificate's anniversary date
C.three months either way of the certificate's anniversary date
D.the three month period centered on the certificate's anniversary date
最新試題
The above mentioned ship has been duly()in accordance with the provisions of the convention referred to.
The bottom of the mast rests on a part of the keel called the mast().
Before welding can be done in a tank that has carried petroleum products,a certificate must be obtained from().
Before welding in a tank that has carried petroleum products,the tank must be certified by ().
The burden of proving unseaworthiness is upon those who()it.
The angle between the flukes and the shank of an anchor is called the().
Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure? ()
Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.
Chafing gear().
Please arrange the survey()early.