A.it
B.this
C.that
D.what
您可能感興趣的試卷
你可能感興趣的試題
A.approves
B.alleges
C.allows
D.permits
A.foot
B.heel
C.step
D.sole
A.prevent the boom from being raised too high
B.prevent the boom from swinging
C.support the boom when not in use
D.prevent the boom from being lowered
A.the three month period immediately following the certificate's anniversary date
B.the three month period immediately preceding the certificate's anniversary date
C.three months either way of the certificate's anniversary date
D.the three month period centered on the certificate's anniversary date
A.holding angle
B.fleet angle
C.fluke angle
D.shank angle
最新試題
Please arrange()a surveyor to inspect the damaged bulkhead.
The annual survey for endorsement of a Load Line Certificate must be held within().
Periodic surveys to renew the load line assignment for a ship must be made at intervals not exceeding().
Before welding in a tank that has carried petroleum products,the tank must be certified by ().
The lines led forward from the bow and aft from the stern when a vessel is moored to the dock are().
The boom stops are installed on an offshore crane to().
Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.
At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for two years. This inspection shall be held between the tenth and fourteenth months of the duration period of the certificate and shall be().
Connecting elements of a mooring system should be fabricated from().
The burden of proving unseaworthiness is upon those who()it.