A.of
B.for
C.with
D.in
您可能感興趣的試卷
你可能感興趣的試題
A.18 months
B.2 years
C.3 years
D.5 years
A.to
B.of
C.for
D.about
A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
A.penetrations
B.plating
C.framing
D.brackets
最新試題
Chafing gear().
The anchors on the bow are known as().
The smallest size of flaw that can be detected on a radiograph examination of a weld will be indicated by the().
In the ship construction portfolio,materials which do not conform to ASTM or ABS specifications must also include the().
The conclusion is()the said ship is fit to continue to sail.
At the same time,it is()for you to signify your acknowledgement of the responsibility for the collision by signing the copies of this letter hereto attached and to return me two copies in due time.
During fueling,all doors,hatches,and ports().
The lines led forward from the bow and aft from the stern when a vessel is moored to the dock are().
Connecting elements of a mooring system should be fabricated from().
I saw the cargo surveyor()the cargo on deck just a minute ago.