A.The required oily-water separator malfunctions
B.The ship is transferred to Liberian registry
C.An annual survey is conducted fifteen months after the date of certificate issuance
D.A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
您可能感興趣的試卷
你可能感興趣的試題
A.chemical and physical properties of the material
B.name of the alternative standard or specification
C.the ASTM or ABS specification the material approximates
D.manufacturer or origin of the material
A.penetrations
B.plating
C.framing
D.brackets
A.examine
B.to examine
C.being examined
D.examining
A.necessity
B.responsibility
C.requirement
D.stipulation
A.to windward should be opened and the ones to leeward should be closed
B.to leeward should be opened and the ones to windward should be closed
C.should be opened
D.should be closed
最新試題
Please arrange()a surveyor to inspect the damaged bulkhead.
At()an occasional survey has been carried out.
In order to withstand fluid head pressure on a ship,stiffeners are often attached to the bulkhead().
Before welding can be done in a tank that has carried petroleum products,a certificate must be obtained from().
During fueling,all doors,hatches,and ports().
The angle between the flukes and the shank of an anchor is called the().
Please arrange the survey()early.
Hatch No.1 must be cleaned up to meet the()of the cargo surveyors.
Sometimes it is desirable to connect a member both by riveting and welding. Which statement is TRUE concerning this procedure? ()
Before welding in a tank that has carried petroleum products,the tank must be certified by ().