A.cargo
B.box
C.cargo and box
D.rate weight
您可能感興趣的試卷
你可能感興趣的試題
A.transverse moment
B.vertical moment
C.righting moment
D.inclining moment
A.submerged hulls
B.quarters
C.columns and upper structure
D.submerged connecting structures
A.fore
B.advance
C.before
D.beforehand
A.ballast
B.reserve buoyancy
C.displacement
D.rolling periods
A.or
B.and
C.nor
D.either
最新試題
Intact buoyancy is a term used to describe().
A vessel would be referred to as tender when the weight of the cargo is().
Reserve buoyancy is the().
On a semisubmersible ship,reserve buoyancy is increased by the presence of void spaces above the waterline in the().
Aboard a vessel,multiplying a load’s weight by the distance of the load’s center of gravity from the centerline results in the load’s().
Although KG for a ship in lightweight is relatively high,the vessel is stiff because().
Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().
It is apparent that there was not sufficient depth of water()and I claim that the estimated arrival draft as radioed to the agent to report to you was a close one.
On a vessel,multiplying a load’s weight by the distance of the load’s center of gravity above the baseline results in a(n)().
The average of the forward and after drafts is the().