A.connect to the busbar when the load increasing
B.supply power specially to charging panel
C.be put into operation during the ship arriving at or leaving port
D.ensure the power supply to critical equipment after the main switchboard out of power
您可能感興趣的試卷
你可能感興趣的試題
A.Ammeter
B.Voltmeter
C.Wattmeter
D.Synchroscope
A.argo winch
B.Windlass
C.Steering gear
D.Air compressor
A.Emergency fire pump
B.Windlass
C.Main sea water pump
D.Fresh water pump
A.Accommodation lighting
B.Windlass
C.Main sea water pump
D.Compressor
A.Navigation lamp
B.Windlass
C.Main sea water pump
D.Compressor
最新試題
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
The treatment of the fuel oils involves storage, heating, filtering and()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
If separating effect is not good, which measure should be taken ()
The shipboard oil pollution emergency plan will be invalid after ()
The condensers located in various stages of a flash evaporator are cooled by()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
The ISPS Code consists of a mandatory section-Part A, which shows()
The main purpose of port State control is not to()