A.precaution measures
B.safety measures
C.security measures
D.emergency response measures
您可能感興趣的試卷
你可能感興趣的試題
A.the SSO
B.the PSCO
C.the CSO
D.the Administration
A.Ship Security Officer
B.Designated Person Ashore
C.Internal Auditor
D.Patrol Team
A.5%
B.8%
C.6%
D.3%
A.the International Convention for the Safety of the Life at Sea
B.the International Convention for the Prevention from ships
C.the International Convention on Standards of Training, Certification and Watch keeping for Seafarers
D.the International Convention for the Control and Management of Ship’s Ballast Water and Sediments
A.SOLAS
B.MARPOL
C.STCW
D.Ballast Water convention
最新試題
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
If separating effect is not good, which measure should be taken ()
() is not installed on the main switchboar.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
The main purpose of port State control is not to()