A.the ISM Code
B.the ISPS Code
C.the IBC Code
D.the IGC Code
您可能感興趣的試卷
你可能感興趣的試題
A.English, French or Spanish
B.Chinese, English or French
C.English, French or Japanese
D.Chinese, English or Spanish
A.six months
B.two years
C.four years
D.five years
A.the chief engineer officer
B.the master of the ship
C.the manager of the company
D.the Administration
A.bridge log
B.Master’s log
C.engine room log
D.oil record book
A.local port authority
B.Corps of Engineers
C.USCoast Guard
D.state pollution board
最新試題
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
To proceed to the assistance of a ship in distress is()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
Under MARPOL Code the ship to which it applies has to carry ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
Using a file without a handle may result in ()