A.ISM
B.DOC
C.SMC
D.PSC
您可能感興趣的試卷
你可能感興趣的試題
A.spends;in
B.spent;on
C.has spent;on
D.had spent;in
A.Class A
B.Class B
C.Class C
D.B+C
A.Ship security officer
B.Company security officer
C.Port facility security officer
D.PSC officer
A.Ship security officer
B.Company security officer
C.Port facility security officer
D.PSC officer
A.Ship security officer
B.Company security officer
C.Port facility security officer
D.PSC officer
最新試題
The main purpose of port State control is not to()
Which of the following items don’t belong to dock repair works?()
Diesel engine air start system check valves are opened by ()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
To proceed to the assistance of a ship in distress is()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
The cetane rating of diesel fuel is an indication of the ()
The condensers located in various stages of a flash evaporator are cooled by()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()