A.Class A
B.Class B
C.Class C
D.B+C
您可能感興趣的試卷
你可能感興趣的試題
A.Ship security officer
B.Company security officer
C.Port facility security officer
D.PSC officer
A.Ship security officer
B.Company security officer
C.Port facility security officer
D.PSC officer
A.Ship security officer
B.Company security officer
C.Port facility security officer
D.PSC officer
A.Ship security plan
B.Company security plan
C.Port facility security plan
D.National security plan
A.Ship security plan
B.Company security plan
C.Port facility security plan
D.National security plan
最新試題
The shipboard oil pollution emergency plan will be invalid after ()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
() is not installed on the main switchboar.
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Cold weather starting of a diesel engine may be made easier by()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
The ISPS Code consists of a mandatory section-Part A, which shows()
Which of the following items don’t belong to dock repair works?()