A.Acetylene
B.Lube oil
C.Grease
D.All of the above
您可能感興趣的試卷
你可能感興趣的試題
A.cover the area with foam
B.cover the area with absorbent material
C.wash down immediately with a fire hose
D.wash down immediately with an oil dispersing solvent
A.smoke
B.rate of temperature rise
C.ionized particles
D.all of the above
A.Oil
B.Wood
C.Rags
D.Electrical wiring
A.main switchboard
B.engine room bilge
C.breathing compartment
D.electric fresh water transfer pump
A.one year from the date of issue
B.two years from the date of issue
C.three years from the date of issue
D.four years from the date of issue
最新試題
The shipboard oil pollution emergency plan will be invalid after ()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
Using a file without a handle may result in ()
Cold weather starting of a diesel engine may be made easier by()
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
Under MARPOL Code the ship to which it applies has to carry ()
() is not installed on the main switchboar.