A.one year from the date of issue
B.two years from the date of issue
C.three years from the date of issue
D.four years from the date of issue
您可能感興趣的試卷
你可能感興趣的試題
A.IMO
B.CCS
C.USCG
D.PICC
A.is drilling on the Outer Continental Shelf
B.moves to a new drilling location in U-Swaters
C.engages in a voyage to a port of another country which is a party of MARPOL
D.All of the above
A.transmitting the heat of a fire through the ships metal
B.burning liquids flowing into another space
C.heated gases flowing through ventilation systems
D.the transfer of heat across an unobstructed space
A.to starboard
B.to port
C.forward
D.aft
A.Class "A"
B.Class "B"
C.Class "C"
D.Class "D"
最新試題
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
If separating effect is not good, which measure should be taken ()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Which of the following items don’t belong to dock repair works?()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
The ISPS Code consists of a mandatory section-Part A, which shows()