單項(xiàng)選擇題The results of the audits and reviews () to the attention of all personnel having responsibility in the area involved.

A.should bring
B.should be brought
C.should take
D.should be taken


您可能感興趣的試卷

你可能感興趣的試題

2.單項(xiàng)選擇題Ship fire-fighting organization includes ().

A.general alarm and fire control plans
B.muster stations and duties of individual
C.patrol system
D.All of the above

4.單項(xiàng)選擇題The main causes of fire on board ships are ()

A.oil leakage in engine-room
B.hot work (welding, cutting, etc)
C.static electricity
D.all of the above

5.單項(xiàng)選擇題The basic training in fire prevention and fire fighting should include the theoretical elements which should cover ().

A.the three elements of fire and explosion
B.lower and upper flammable limits
C.classification of flies and applicable extinguishing agents
D.All of the above

最新試題

Diesel engine air start system check valves are opened by ()

題型:?jiǎn)雾?xiàng)選擇題

During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.

題型:?jiǎn)雾?xiàng)選擇題

By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()

題型:?jiǎn)雾?xiàng)選擇題

The condensers located in various stages of a flash evaporator are cooled by()

題型:?jiǎn)雾?xiàng)選擇題

Engine parameters shall be corresponded to NOx Technical Files. This is required by ()

題型:?jiǎn)雾?xiàng)選擇題

If two A.C.generators are to be operated in parallel, the load is distributed evenly by()

題型:?jiǎn)雾?xiàng)選擇題

Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()

題型:?jiǎn)雾?xiàng)選擇題

()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.

題型:?jiǎn)雾?xiàng)選擇題

As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()

題型:?jiǎn)雾?xiàng)選擇題

When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish

題型:?jiǎn)雾?xiàng)選擇題