In project management, a ( )is a list of a project’s milestones, activities, and deliverables, usually with intended start and finish date. Those items are often estimated in terms of resource allocation, budget and duration, linked by dependencies and scheduled events.
A. schedule
B. WBS
C. SOW
D. charter
( )can be considered as part of risk mitigation.
A. Risk identification
B. Purchasing insurance
C. Assessment of outcomes
D. Assessment of probabilities
( )is not the advantage of GERT (Graphical evaluation and review techniques)as compared with PERT (project evaluation and review techniques).
A. Allowing looping
B. Allowing for dummy tasks
C. Allowing branching
D. Allowing multiple project end results
最新試題
識(shí)別和管理項(xiàng)目風(fēng)險(xiǎn)的責(zé)任應(yīng)由誰承擔(dān)?()
你是一家旅行用品公司的項(xiàng)目經(jīng)理。你公司準(zhǔn)備在即將推出的春季產(chǎn)品目錄中增加一款新產(chǎn)品線。你的項(xiàng)目組要用10個(gè)月的時(shí)間獲得供應(yīng)商的合同、確定設(shè)計(jì)方案、將產(chǎn)品加入產(chǎn)品目錄以及備貨。這是以下哪項(xiàng)所描述的例子?()
某項(xiàng)目經(jīng)理剛被聘用,并設(shè)法與他人的合作。在這種狀態(tài)下,他要采用哪種最佳的權(quán)利方式來獲得合作?()
投資回收期的財(cái)務(wù)分析確定()
在固定價(jià)合同中,費(fèi)用或利潤是:()
項(xiàng)目管理的過程管理和功能管理(知識(shí)領(lǐng)域)的關(guān)系是:()
WBS是項(xiàng)目構(gòu)成單元的一個(gè)“產(chǎn)品導(dǎo)向”的構(gòu)架。WBS中的每一項(xiàng)一般都只有一個(gè)確定指標(biāo),這些指標(biāo)是:()
你是某公司網(wǎng)絡(luò)布線項(xiàng)目的項(xiàng)目經(jīng)理。你的班子成員包括六位全職雇員和三位承包商。他們都是第一次共同工作。你知道班子建設(shè)的步驟將按以順序進(jìn)行:()
你知道變更控制系統(tǒng)很重要,因?yàn)樗鼈兠枋隽巳绾翁峤蛔兏?qǐng)求并且記錄了如何管理變更、跟蹤變更的狀態(tài)和確定變更的管理影響。在控制過程組中下列哪個(gè)過程沒有運(yùn)用變更控制系統(tǒng)作為工具和技術(shù):()
工作A悲觀估計(jì)需要36天完成,很有可能21天完成,樂觀估計(jì)只用6天完成,那么工作A從16天到26天之間完成的可能性是()