A.cutoff
B.outdraft
C.lockwash
D.springpool
您可能感興趣的試卷
你可能感興趣的試題
A.the wake is less pronounced
B.the vessel is more responsive to the rudder
C.squat will cause a decrease in bottom clearance and an increase in draft
D.All of the above
A.Buoyancy
B.Freeboard
C.Draft
D.Displacement
A.Press up any slack double-bottom tanks to eliminate free surface
B.Flood any empty double-bottom tanks to add weight low and down
C.Jettison topside weights to reduce KG and KB
D.Shift any off-center weights from port to starboard
A.press up a slack double bottom tank on the port side
B.fill an empty centerline double bottom tank
C.pump out a slack marine portable tank located on the portside amidships
D.jettison the anchors and anchor cables
A.Jettison any off-center topside weights to lower GM and correct the list
B.Pump out any slack after double-bottom tanks to reduce free surface and increase freeboard aft
C.Pump out the after peak and fill the forepeak to change the trim
D.Press up any slack double-bottom tanks forward of the tipping center,then fill the forepeak if empty
最新試題
The center of the underwater volume of a floating vessel is the().
Allowance for fresh water for all freeboards other than timber 25mm. This wording is likely to appear in().
The controlling depth of the river is().
Reserve buoyancy is().
The average of the forward and after drafts is the().
Owing to the big draft,the ship is not permitted to go alongside until the time of().
Reserve buoyancy is the().
For a floating vessel,true mean draft is always the().
For an upright vessel,draft is the vertical distance between the keel and the().
It is apparent that there was not sufficient depth of water()and I claim that the estimated arrival draft as radioed to the agent to report to you was a close one.