A.increasing the permeability of the pumproom
B.reduction of drill water from the storage tanks
C.a list caused by water filling the compartment
D.a reduced KG caused by water filling the compartment
您可能感興趣的試卷
你可能感興趣的試題
A.progressive downflooding
B.reducing the level of drill water from the storage tanks
C.causing a list due to the water in the compartment
D.reducing the KG to minimum allowable
A.one category I 406 Mhz satellite EPIRB
B.at least one life buoy on each side of the vessel fitted with a buoyant life line
C.at least 12 rocket parachute flares
D.All of the above
A.at work,only
B.in his or her berthing area,only
C.BOTH at work and in his or her berthing area
D.None of the above
A.have a design burst pressure of at least 25 psig
B.be capable of withstanding at least 2.0 psi vacuum without collapsing or constricting
C.be electrically continuous with a maximum resistance of ten thousand ohms
D.All of the above
A.six weeks
B.six months
C.twelve months
D.two years
最新試題
Each EPIRB required on an OSV shall be tested using the integrated test circuit and output indicator every().
Fire protection regulations for towing vessels require all crew members to know how to perform each of these tasks EXCEPT().
Each hand portable fire extinguisher on a ship must be marked with().
Fighting a rig fire in the ballast pumproom with hoses would adversely affect the stability of the rig most by().
During storm conditions on a ship,the mooring tensions should be adjusted so that().
Each EPIRB required on a ship shall be stowed in a manner which will permit().
During oil transfer operations,who is responsible for ensuring that the posted transfer procedures are followed?()
During transfer operations,a quantity of propylamine spills on deck. According to the Chemical Data Guide,the correct procedure would be to().
Each hose used for transferring vapors must().
Each fire pump on a tanker must have a pressure gauge located at().