A.the broken stowage listed
B.the broken stowage calculated
C.the broken stowage given
D.the actual broken stowage
您可能感興趣的試卷
你可能感興趣的試題
A.together with
B.on top of
C.underneath
D.away from
A.rigging a back stay
B.raising the boom
C.increasing the mechanical advantage of the cargo purchase
D.taking all slack out of the preventer
A.provide
B.provides
C.providing
D.be provided
A.braces
B.dunnage
C.shores
D.toms
A.cargo elevators
B.conveyor belts
C.ramps
D.derricks and winches for cargo handling
最新試題
Sometimes the contract()that the lump sum freight must be paid in advance and will not be returnable even if the vessel and/or her cargo are lost.
The additional cargo is to be loaded()board our ship.
Please choke up the drums to prevent().
There are 65()of Grade No.3 rubber short.
Roll-on/roll-off ships are equipped with().
The chassis of 15 trucks are rust-stained,particularly()near the mast house.
What do you think()not putting such remarks?
Strong smelling cargo should be stowed()the cargo absorbing foreign smell.
The actual amount of cargo loaded depends upon().
The National Cargo Bureau represents the().