A.provide exhaust back pressure
B.prevent exhaust smoke emissions
C.power a reciprocating supercharger
D.muffle exhaust gas noise
您可能感興趣的試卷
你可能感興趣的試題
A.Plugged injector nozzles
B.Excessive fuel injection
C.Very late injection timing
D.Incorrect crankshaft clearance
A.a glazed surface on the spring
B.nicks in the protective coating
C.a build up of sludge deposits
D.cracks in the surface of the spring
A.Frequent draining of accumulated moisture
B.Frequent testing of relief valves
C.A close watch on temperature to prevent fluctuations in pressure
D.Frequent cleaning to re move oil and foreign matter
A.over-speeding
B.overload
C.low exhaust temperature
D.high crankcase pressure
A.line up the engine fore restarting with light diesel oil
B.reposition the fuel injection cam
C.change the intake and exhaust valve cam positions
D.place the starting cam in the intermediate position
最新試題
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
The ISPS Code consists of a mandatory section-Part A, which shows()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
The flash point of a residual fuel oil should be used to determine the highest temperature to which oil may be heated()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
When does auxiliary burner of incinerator put into operation? ()Ⅰ. start incinerator when it is coldⅡ. the sludge for dealing with is littleⅢ. the sludge for dealing with is largeⅣ. the water and impurity in sludge are too muchⅤ. the temperature in incinerator is lowⅥ. dealing with little solid rubbish
The main purpose of port State control is not to()
The shipboard oil pollution emergency plan will be invalid after ()