A.the ship security plan
B.the company security plan
C.the port security plan
D.the national security plan
您可能感興趣的試卷
你可能感興趣的試題
A.Inspector general
B.Captain of the port
C.local port authority
D.state pollution board
A.expansion space to leave in a tank
B.flash point at which the fuel will burn
C.temperature to which the fuel must be heated
D.rate at which the fuel can be pumped during transfer operations
A.second stage feed heater
B.saltwater feed heater
C.distillate cooler
D.second stage vapor separator
A.spray pipes
B.demisters
C.condensers
D.splash baffles
A.deaerate the first effect distillate
B.filter the condensed flash vapors
C.deaerate the first and second effect distillate
D.remove small water droplets entrained in the flashed vapor
最新試題
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Engine parameters shall be corresponded to NOx Technical Files. This is required by ()
The main purpose of port State control is not to()
Under MARPOL Code the ship to which it applies has to carry ()
To shut down a diesel engine after it exceeds the set maximum speed,which type of device listed should be used?()
The treatment of the fuel oils involves storage, heating, filtering and()
The cetane rating of diesel fuel is an indication of the ()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()