A.in any emergency or if in any doubt as to what decision or measures to take
B.in the event of any impending action in machinery spaces that may cause reduction in ship’s speed
C.when isolating and bypassing machinery to be worked on
D.co-operating with any engineer in charge of maintenance work
您可能感興趣的試卷
你可能感興趣的試題
A.the chief engineer
B.the designated engineer from shipyard
C.the designated duty officer in charge of the engineering watch
D.the designated surveyor from classification society
When deciding the composition of the engineering watch, which may include appropriately qualified ratings, following criteria shall be taken into account()
Ⅰ.the type of ship
Ⅱ.the type and condition of the machinery
Ⅲ.the safety of life, ship, cargo and port
Ⅳ.the observance of international, national and local regulations
A.Ⅰ+Ⅱ
B.Ⅱ+Ⅲ
C.Ⅱ+Ⅲ+Ⅳ
D.Ⅰ+Ⅱ+Ⅲ+Ⅳ
A.satisfied engineers
B.qualified ratings
C.satisfied chief engineer
D.qualified chief engineer
A.ship-owner’s
B.master’s
C.chief engineer’s
D.manager’s
最新試題
Flame failure in an automatically fired auxiliary boiler can from a/an ()
During the diesel engine running, the water level of F.W expansion tank should normally kept in the () level of glass tube.
To proceed to the assistance of a ship in distress is()
The main purpose of port State control is not to()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
If separating effect is not good, which measure should be taken ()
One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()
()connectors hold best if a wire is accidentally pulled or a connection becomes loose.
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.