A.turn off power first
B.turn on power first
C.with a test pen in hand
D.tell C/E
您可能感興趣的試卷
你可能感興趣的試題
A.ammeter
B.voltmeter
C.synchroscope
D.A+B+C
A.either;or
B.neither;nor
C.such;that
D.so;that
A.that
B.when
C.if
D.whether
A.rise, rise also
B.rise, drop
C.drop, rise
D.drop, drop also
A.excessive internal leakage in the pump
B.low discharge pressure and fluid flow
C.excessive fluid level in the hydraulic reservoir
D.operation of the pump at 100% efficiency
最新試題
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
()are used to digest the sewage to produce innocuous sludge in a biological sewage treatment plant.
Flame failure in an automatically fired auxiliary boiler can from a/an ()
The additional mark ()in the Classification Certificate for Machinery means propulsion apparatus is remotely controlled on the navigating bridge control station, and engine assembly control station is unmanned periodically.
The ISPS Code consists of a mandatory section-Part A, which shows()
The main purpose of port State control is not to()
Under MARPOL Code the ship to which it applies has to carry ()
The cetane rating of diesel fuel is an indication of the ()
If two A.C.generators are to be operated in parallel, the load is distributed evenly by()
“Insufficiency of manning or insufficiency of certification of seafarers” is an identification of a()