A.available minimum requirements
B.available maximum requirements
C.mandatory minimum requirements
D.mandatory maximum requirements
您可能感興趣的試卷
你可能感興趣的試題
A.the bridge watch-keeper
B.the captain
C.the chief engineer
D.the engine room staff
A.the engineer officer in charge of watch
B.the deck officer in charge of watch
C.the master
D.the chief mate
A.3 years after making the first entry
B.2 years after the last entry
C.3 months after last entry
D.3 years after the last entry
A.port state control
B.flag state control
C.fire and boat drill
D.Safety inspection
A.additional
B.permanent
C.temporary
D.long
最新試題
The shipboard oil pollution emergency plan will be invalid after ()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
If separating effect is not good, which measure should be taken ()
By comparing the exhaust gas temperature of each cylinder, the operator can determine if the load is balanced throughout the engine. The device most commonly used is a()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
Using a file without a handle may result in ()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
Thermostatic steam pressure reducing valves are used in the fuel oil service system to control the()
The ISPS Code consists of a mandatory section-Part A, which shows()