A.12 months since last dry-docking
B.18 months since last dry-docking
C.24 months since last dry-docking
D.36 months since last dry-docking
您可能感興趣的試卷
你可能感興趣的試題
A.Replace the batteries
B.Check the sampling tube for blockage
C.Adjust the final reading by the amount the needle is displaced from zero
D.Replace the platinum filament
A.either
B.the master
C.the Shipowner
D.neither
A.on
B.in
C.at
D.with
A.despatched
B.detained
C.detected
D.delivered
A.under deck
B.on deck
C.ondeck only
D.under deck only
最新試題
It is generally NOT allowed to clean up an oil spill by using().
Outlets in gasoline fuel lines are().
The sign used to caution persons approaching the gangway of a tank barge during cargo transfer reads().
Many dangerous cargoes are stowed on deck because of the().
The case for Dangerous Goods in question was badly crushed and was returned to dock shed and ().
COMPATIBILITY OF GOODS states().
We will()special attention to the dangerous cargo.
Corrosive liquids and acids should have what kind of label? ()
When stowing hazardous materials on deck,lashing of such cargo is permitted if().
Which cargo would require a dangerous cargo manifest? ()