A.height of the metacenter
B.fighting arm
C.righting moment
D.metacentric height
您可能感興趣的試卷
你可能感興趣的試題
A.all ballast is processed through the oily water separator
B.ballast is taken on and discharged through a separate main deck riser
C.ballast and cargo tanks are separated by cofferdams
D.all ballast lines, tanks, and pumps are independent of those used for oil
A.discharge of ballast or cleaning water from fuel tanks
B.sounding levels of all fuel tanks on a daily basis
C.grade and specific gravity of all fuel oil carded
D.fuel consumption rates on a weekly basis
A.the oil content in water
B.the water content in fuel oil
C.the water level in bilge well
D.the oil level in bilge well
A.programs
B.progress
C.members
D.measures
A.familiar
B.understand
C.conversation
D.confused
最新試題
Which one is NOT the ‘clear grounds’ for a more detailed inspection?()
As soon as a diesel engine has started, which of the listed engine operating parameters should be checked FIRST?()
Which of the listed governor characteristics will greatly affect the load sharing relationship between paralleled diesel generators?()
A purge recovery system is used in a centrifugal air conditioning or refrigeration system to ()
The Port State Control officer may witness a fire drill carried out by the crew assigned to these duties on the()
Cold weather starting of a diesel engine may be made easier by()
Which of the diesel engine components listed increase air density and helps to improve engine operating efficiency?()
Under MARPOL Code the ship to which it applies has to carry ()
Refrigerant entering the compressor of a refrigeration system should be in which of the following conditions?()
The ISPS Code consists of a mandatory section-Part A, which shows()