A.has
B.have
C.is
D.are
您可能感興趣的試卷
你可能感興趣的試題
A.takes
B.comes
C.goes
D.gives
A.terminal operator
B.owner of the barge
C.tankerman or person in charge of loading
D.charterer through the Master of the towing vessel
A.is not
B.is
C.does not
D.can hardly be
A.the Shipowner's
B.the Charterer's
C.the cargo owner's
A.The Charterers should sing new bunker contract with oil chandlers
B.The Charterers can use the bunker contracts signed by the Owners with oil chandlers
C.The Charterers shall not sign bunker contracts with oil chandlers
D.The Charterers shall sign bunker contracts with oil chandlers
最新試題
If the ship is delayed by reason of Charterer’s failure to name a port,()will be liable for the damages.
The basic shipping paper that forms an agreement between a shipowner and a charterer is a ().
In modern times,the work of stowage is generally deputed to stevedores,but that does not generally relieve the shipowners()their duties even though the stevedores are,under the charter-party,to be appointed by the Charterers.
That the Shipowner has broken a condition precedent will()the Charterer from the liability to provide a cargo.
Unless otherwise agreed,()must take the goods from alongside,though this obligation may be varied by a custom of the port which is not inconsistent with the express terms of the contract.
Should it appear that war or blockade would prevent the vessel from safely reaching the port of destination and / or discharging the goods thereat,the Carrier().
The right to limit liability in connection with the ship()also extended to Charterers and any person interested in or in possession of the vessel and,in particular,any manager or operator of her.
If the vessel is not discharged in the time stipulated in the charter-party,the Charterer renders()liable to pay demurrage or damages for detention,as the case may be.
To render the()liable,the shipowners must show that the proximate cause of the detention or expense was trading to a river with a bar or to a port with a bar.
The owner is not at liberty to leave the port of call as soon as the time specified in the charter-party has elapsed,though the Charterer may,if the contract so provides,be liable to compensate()for the delay.