A.No, the MODU Code requires that there should be 100% capacity available when all lifeboats in one location are lost or rendered unusable, or all the lifeboats on any one side, or any one corner of the unit are lost or rendered unusable. Generally, this requirement is met by applying 2 x 100% lifeboat capacities
B.Yes, the lifeboats should be able of carrying the number of personnel onboard the unit., i.e. 1 x 100%
C.Yes, provided you have additional liferaft capacity
D.You don’t need lifeboats as long as you have 2 x 100% liferaft capacity
您可能感興趣的試卷
你可能感興趣的試題
A.機艙
B.控制室
C.舵機房
D.駕駛室
A.3000總噸的船,0.2N/mm2
B.4000總噸的船,0.25N/mm2
C.6000總噸的船,0.25N/mm2
D.7000總噸的船,0.3N/mm2
A.駕駛室
B.機艙集控室
C.輪機長室
D.輪機員值班房間
E.船長室
F.水手長儲存間
A.Drainage and other wastes from any form of toilet and urinals
B.Drainage from medical premises (dispensary, sick bay, etc. via wash basin, wash tubsand scuppers located in such premises
C.Drainage from spaces containing living animals
D.Other waste waters when mixed with the drainage defined above
A.900mm
B.600mm
C.760mm
D.450mm
最新試題
某貨輪航行途中,以海上航速撞上礁石,船舶底部被劃開,海水通過箱形中底桁(管子弄)進入機艙,導(dǎo)致機艙大量進水,直接損失超過三千萬。機艙進水的原因是箱形中底桁與機艙的水密門沒法關(guān)閉。請你描述對這道水密門的檢驗要求()
1998-07-01后建造的下列()船舶,其專用海水壓載艙內(nèi)應(yīng)設(shè)有符合A.798(19)規(guī)定的防腐系統(tǒng)?
下列關(guān)于螺旋槳的那些數(shù)據(jù)應(yīng)顯示在駕駛室的指示器中()
根據(jù)《消防安全系統(tǒng)規(guī)則》第5章第2.2.2條的規(guī)定,以下關(guān)于固定式二氧化碳系統(tǒng)的要求描述正確的是()
某驗船師在進行一條2005年2月投入運營的9500GT的遠(yuǎn)洋雜貨船的IOPP檢驗時發(fā)現(xiàn),該船安裝了符合MORPPOL公約AnnexI所要求的油水分離器及含油量檢測/顯示裝置,但卻沒有向舷外排含油量超過15PPM油污水報警裝置,請問下述描述哪個是正確的()
一艘國際航行在航貨船,按照“起重設(shè)備法定檢驗技術(shù)規(guī)則1999”,其起重設(shè)備不允許存在下述()缺陷
驗船師到某一錨鏈廠對錨鏈進行了驗證試驗(ProofTest)。以規(guī)范規(guī)定的驗證載荷試驗結(jié)束后,對整節(jié)錨鏈的個個環(huán)進行仔細(xì)的檢查后發(fā)現(xiàn)有8個環(huán)存在焊縫裂紋或變形過大等缺陷,且該規(guī)格錨鏈1節(jié)由120個普環(huán)組成。驗船師采取的下列措施中正確的是()
Deep-fat cooking equipment shall be fitted with the following:()
十天之前某船在A港完成了變更船名的檢驗,所有證書均已按照規(guī)定程序和要求正確地在甲港完成。但是船長發(fā)現(xiàn)船上的《裝載手冊》上的船名忘了變更,按照SOLAS要求這份文件必須保存在船上。今天船靠泊乙港,船東要求驗船師上船對該文件上的船名變更。請問驗船師在文件上簽署時,應(yīng)包括下列哪些要素?()
An approved constrution portfolio should be provided on all type of unit. The followingcontent should be contained in the construction portfolio:()