A.anchor chain
B.wire rope
C.connecting links
D.pendant wires
您可能感興趣的試卷
你可能感興趣的試題
A.Operations Manual is approved
B.Minerals Management Service approval is issued
C.classification society approval is issued
D.permanent Certificate of Inspection is issued
A.an unprotected drop-light bulb
B.careless disposal or storage of material
C.smoking in bed
D.worn electrical wires on power tools
A.for 1 year
B.for 2 years
C.until the next Coast Guard inspection
D.until the vessel's Certificate of Inspection expires
A.the ship has been named
B.the ship has been built
C.the ship has been signed
D.the ship has been registered
A.Master of the vessel
B.USCG Officer in Charge of Marine Inspection
C.Owner or operator of the vessel
D.Company's personnel director
最新試題
The depth()a shallow patch,lying about 1.3 miles southeastward of Nanshan Tou lighthouse reduces to about 6.1 meters.
The damage to a vessel is over $25,000. Who must notify the nearest Coast Guard Marine Safety or Marine Inspection Office as soon as possible?()
The dangerous semicircle of a hurricane in the Northern Hemisphere is that area of the storm ().
The damage to a vessel is over $25,000. Who must notify the nearest Coast Guard Marine Safety or Marine Inspection Office as soon as possible? ()
() may not justify detention.
Which statement about radio navigational warnings is TRUE().
Which instrument is most useful in forecasting fog().
The complete details of a crude oil washing system aboard your vessel,including the operating sequences and procedures,design characteristics,a description of the system,and required personnel will be found in the().
The dew point is reached when the().
The external flotation bladder of an immersion suit should be inflated().