A.exact quantity of the cargoes
B.grades of the cargoes
C.location of the delivery point(s)
D.name of the consignee(s)
您可能感興趣的試卷
你可能感興趣的試題
A.one A-I
B.one B-I
C.one C-I
D.none required
A.allow sufficient oxygen in the tank to sustain life
B.prevent outside air from entering the tank
C.provide increase in cargo discharge pressure
D.comply with double hull pollution prevention regulations
A.transfer containers without chassis
B.load the vessel with palletized cargo
C.transport vehicles
D.be loaded full and down to her marks
A.cargo fill
B.line drop
C.transfer
D.branch line
A.the nature of the cargo being carried
B.changes in heading
C.major structural repair
D.All of the above
最新試題
To “shore up” the main deck for the stowage of deck cargo means to().
The primary objective of a Ro-Ro vessel is to().
When commencing cargo operations on a container ship,one cell at a hatch is generally discharged completely (to the bottom of the ship) before removing any containers from the adjoining cells to().
When measuring the oxygen content of the cargo tanks prior to loading cargoes requiring vapor recovery,check it().
Which of the following element(s) should be taken into account in the preparation of the “Cargo Securing Manual”? ()
When clearing customs for a foreign voyage,which of the following is processed at the custom’s house and returned to the vessel? ()
Which of the following is the stated proper sequence before commencing cargo operations aboard Ro-Ro vessels?()
Which of the following statement(s) is/are TRUE regarding lashing requirements to secure vehicles aboard Ro-Ro vessels? ()
When considering a vessel’s stability,which spaces in a general cargo vessel are the best locations for the carriage of bulk grain? ()
Which of the following actions are stated in the correct order prior to loading or discharging cargo on a Ro-Ro vessel? ()