A.A vessel engaged in laying,servicing or picking up a navigation mark,submarine cable or pipeline
B.A vessel engaged in dredging,surveying or underwater operations
C.A vessel engaged in replenishment or transferring persons,provisions or cargo while underway
D.A power driven vessel which because of her draught in relation to the available depth and width of navigation water is severely restricted in her ability to deviate from the course she is following
您可能感興趣的試卷
你可能感興趣的試題
A.Any aircraft designed to maneuver on the water
B.A vessel engaged in dredging,surveying or underwater operations
C.A vessel under sail provided that propelling machinery is not used
D.A small vessel sailing at night
A.are
B.is
C.have
D.has
A.ship surveyor's report
B.a ship's certificate
C.a cargo inspection report
D.a diver survey report
最新試題
I saw the cargo surveyor()the cargo on deck just a minute ago.
The bottom of the mast rests on a part of the keel called the mast().
At least one reinspection shall be made on each vessel holding a Certificate of Inspection valid for two years. This inspection shall be held between the tenth and fourteenth months of the duration period of the certificate and shall be().
Should the vessel have no deratisation certificate at the time of her delivery,she()be held to be unseaworthy.
The anchors on the bow are known as().
Chafing gear().
The boom stops are installed on an offshore crane to().
Prior to burning or welding on a fuel tank on a ship,regulations require that an inspection be made. An entry in the unofficial logbook is required if this inspection is made by().
In order to withstand fluid head pressure on a ship,stiffeners are often attached to the bulkhead().
Let’s submit the case() the cargo surveyor.