A.when was your vessel built
B.at what time is your vessel building
C.when is your vessel built
D.at what time you built your vessel
您可能感興趣的試卷
你可能感興趣的試題
A.low water reference plane
B.low winter runoff point
C.least water river plane
D.land wall reference point
A.to
B.with
C.on
D.for
A.happens
B.has happened
C.happened
D.had happened
A.having your approval
B.approved by you
C.get your answer
D.know your opinion
A.at the same time
B.exclusively
C.within the same period
D.consecutively
A.which
B.where
C.when
D.that
A.to have missed
B.to have omitted
C.to have lost
D.to have dropped
A.all in all
B.after all
C.above all
D.over all
A.it
B.this
C.what
D.that
A.inform
B.informing
C.to inform
D.will inform
最新試題
The broadcast will normally be made on the two listed frequencies simultaneously except during transmitter maintenance periods when the broadcast will be made on the two frequencies().
Marks and Nos.,Number and kind of packages,description of goods should be declared in ().
The expression THE AIR IS SATURATED means().
MV ATLANTIC AT 0205UTC A BLACK FLOATING MINE WAS SIGHTED IN APPROX POSITION LAT 15.30N LONG 112.30E DANGEROUS TO NAVIGATION VESSELS IN VICINITY. According to this cable,the mine().
I know nothing()about it.
I look forward to()for this at your earliest convenience.
I’d like to apply()its extension.
I wish to inform you that as a result of negligence on the part of the lighter Susan when shifting at 0910 hrs this morning,the lower platform of the gangway was().
I hold your ship fully responsible()the accident.
Please kindly arrange for shore workers to do()during loading the heavy cargo on deck as soon as possible.