A.Declaration of Deadweight Tonnage of Cargo
B.Notice of Demurrage
C.Notice of Despatch
D.Notice of Readiness
您可能感興趣的試卷
你可能感興趣的試題
A.dress my ship overall
B.raise my ship overall
C.hoist my ship overall
D.display my ship from stem to stern
A.another
B.other
C.the other
D.the others
A.Notice of Readiness
B.Master Certificate of Service
C.Shipmasters Declaration
D.Vessel Utilization and Performance Report
A.it will be preceded by a sudden increase in wind speed
B.it will be preceded by a sudden decrease in wind speed
C.the wind speed will not change as it passes
D.the wind will back rapidly to left in a counterclockwise direction as it passes
A.to
B.for
C.at
D.on
最新試題
That BE IT KNOWN THAT MV GLUCKAULF UNDER MY COMMAND HAS A DWC OF 12,431 M/T ON SUMMER LOADLINE,AND A BALE CAPACITY OF 18,439 CU.M.AND A GRAIN CAPACITY OF 19,941 CU.M.is likely to be the wording of().
The Master of a vessel may tender a Notice of Readiness to the charterer when the vessel ().
Please return the notice to me()due time.
In the absence of a custom or special contract to the contrary,the Shipowner is not bound to ()the consignees that he is ready to unload on arriving at the port of discharge.
I’m not fully aware()what happened at the loading port.
The survey will in no way()cargo operation,but the main engine will require four-hour notice to be ready if necessary after completion of the survey.
Please return the copies attached()your signature.
Please report your position 4 hours()advance.
I undertake to bring to the notice of the Suez Canal Authorities,before my vessel()the Canal,any defects which may appear.
The Local Notice to Mariners is usually published().